My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-19_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2012-09-19_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:08:16 PM
Creation date
9/20/2012 9:01:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REPORT
Doc Date
9/19/2012
Doc Name
3rd Quarter 2012 South Taylor Fill Monitoring
From
Colowyo Coal Company
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Taylor Fill Inspection Certification <br />On September 13, 2012, I inspected the area in which the South Taylor Excess Spoil Fill is being <br />constructed. This report covers activities associated with the East Taylor Fill and the West Taylor <br />Fill identified on Map 23A of the approved permit. The purpose of this inspection was to observe <br />status of the fill placement. This inspection is necessary to satisfy the requirements of CDRMS <br />Rule 4.09.10 (la) and Rule 4.09.1 (1 b). Weather conditions were clear and all portions of the fill <br />were visible. <br />A -A' Area: The construction on the entire A -A' underdrain including fabric installation has been <br />completed. The uppermost portion of the drain remains uncovered while the central portion has <br />been covered with fill. The lowermost portion of the drain has been covered to within 100 feet of <br />the inlet of the West Taylor pond. Fill placement continues. The toe is filled and sloped to the 7800 <br />elevation and rip rap placement has begun on both the West Taylor West Trib and West Taylor <br />East Trib channels. Dumping continues on the 7850 bench. Flows through the drain continue to <br />contribute inflow to the West Taylor pond. During the quarter, the monitoring piezometer was drilled <br />and completed at El ,344,205.55, N336,564.33, Elev. 7731.2. The first water level reading of 225.3 <br />feet was obtained. <br />B -B' Area: Underdrain construction is completed and all portions of the drain have been covered. <br />Fill placement continues. Substantial quantities of fill have been placed over the drain. <br />C -C' Area: Underdrain construction is completed and all portions of the drain have been covered. <br />Fill placement continues. The 7800, 7850, 7900, and 7950 dump benches are completed. The <br />8000 bench and all higher benches were inactive during this quarter. <br />In November, 2010, TR -88 was approved to extend the toe of the temporary fill. Further, in June, <br />2011, a permit change designated as TR -81 was approved to make these changes permanent with <br />the modification of the postmining topography. <br />Design requirements for the spoil pile are addressed in Volume 13, Exhibit 21, Item 1, Introductory <br />Letter. Inspection requirements during construction are further detailed in Volume 12, Section 4.09. <br />I am a Registered Professional Engineer in the State of Colorado and a representative of <br />Environmental Solutions, Inc, P. O. Box 2996, Cheyenne, Wyoming. Being familiar with the <br />Colowyo operation and the coal program permitting process in Colorado, the construction activities <br />related to the East Taylor Fill are in conformance, to the best of my knowledge and experience, as <br />specified in the Introductory pages and the associated report found in Volume 13, Exhibit 21, Item 1 <br />and other applicable requirements of the approved permit documents, a portion of CDRMS Permit <br />C -81 -019. osum#4 <br />�.........� <br />• <br />O • ff 5 c. P • i <br />'- 32257 C <br />• o <br />\ • e.. .. 4. <br />4 FS • •.....• \ • <br />i ENV .� <br />THOMAS C PETERS • <br />xc: Mr. Kurtis Blunt, Colowyo Coal Co pa n y , 322 57 ON <br />cf 17.15.1 <br />cf 24.20 (South Taylor Fill) DATE <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.