My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-19_PERMIT FILE - X201222311 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201222311
>
2012-09-19_PERMIT FILE - X201222311 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:08:16 PM
Creation date
9/19/2012 3:00:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201222311
IBM Index Class Name
Permit File
Doc Date
9/19/2012
Doc Name
Surface Access Agreement #3 (Emailed)
From
Oxbow Mining, LLC
To
DRMS
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "C" Exploration License No. COC -74911 <br />with those of surrounding areas. We do not anticipate any unique values or resources of special concern. Soils on <br />the ridgelines and steep valley sideslopes are generally shallow and rocky with deeper, more developed soils in <br />the valley bottoms. Soils vary in thickness and generally contain a high percentage of rack fragments interbedded <br />with clay and siltstones. <br />Biology: <br />Vegetation cover types are projected to be consistent with the terrain and semi -arid climate found on the <br />upland area, with mountain shrubland (Juniper, Gambel's Oak, (waking Aspen, Big Sagebrush, and various <br />grasses as the primary species), Juniper - Woodland (Juniper, Oak, Mountain Snowberry, Saskatoon Serviceberry, <br />and Mountain Mahogany as the primary species) vegetation types being the dominant varieties. A wide range of <br />wildlife species are projected to inhabit the general area, although use and habitat values maybe limited by the <br />semi -arid climate and terrain and vegetative cover types. The area will be evaluated for applicable T&E and <br />sensitive species per license requirements. <br />Cultural Resources and National Register of Historic Places <br />The area will need to be evaluated for cultural resources before drilling occurs. <br />Typical drilling meth ods and�activi th at may occur during the exploration drilling process <br />Oxbow Mining, LLC expects to drill 43 exploration drillholes as shown on Table I below. This table <br />provides a summary of the proposed exploration hales. The attached map (Plate 2) Oak Mesa Project, Proposed <br />Drilling Program shows the projected drilling locations. <br />Once the exploration application and State NO to drill have been approved, drilling will commence as <br />soon as weather and ground conditions and surface access agreements allow. The drilling season is expected to <br />last from late March to Mid November, but may vary depending upon weather and surface owner access <br />agreements. Drilling is projected to consist of at least two crews per drilling rig drilling 10 -12 hr. days with four <br />days off. Drilling equipment is projected to consist of a PortadrilI TKT sized rig that can complete both rotary <br />and coring activities with the same rig. All drilling equipment will be inspected to ensure that appropriate safety <br />equipment is available should the need arise. Supporting that rig will be a 4000 gal water truck, a flatbed truck <br />with drilling supplies, and an E -log truck for running digital logs of each drill hole and two pickups for crew <br />transportation. <br />Excavated earth or debris- disposal activities: <br />Sites, whenever possible, will be accessed using existing available light duty pre - existing ranch roads. <br />When roads are not available, temporary roads will typically be constructed using a grader, which will blade <br />using sidecast methods an approximate 12 foot wide running surface. Road construction estimates are based upon <br />currently available satellite photographs. Drillhole locations maybe adjusted slightly in the field to optimize the <br />placement of the drill pad. Light use roads and road construction distances may be adjusted to represent the more <br />current information. <br />Most existing road alignments will not require modification, but may require road maintenance <br />consisting of grading the road to provide a smooth operating surface, clean -out and repair of any existing <br />drainage ditches and application of temporary drainage control measures (berms, straw bales, silt fences, gravel <br />surfacing, etc.) as necessary. New road construction will be kept to a minimum and will follow applicable BLM <br />specifications. Following the conclusion of drilling activities, the temporary roads will be obliterated by grading <br />to approximate original contour and distributing the rock, brush, soils, etc pushed along the sides of the road back <br />across the road corridor. Total estimated disturbance is 21.5 acres for Forty -three (43) drill pads and 14.29 acres <br />for roads for a total disturbance of 35.79 acres. <br />August 26, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.