My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-19_PERMIT FILE - X201222311
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201222311
>
2012-09-19_PERMIT FILE - X201222311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:08:16 PM
Creation date
9/19/2012 2:53:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201222311
IBM Index Class Name
Permit File
Doc Date
9/19/2012
Doc Name
Surface Access Agreements for Oxbows Oak Mesa Exploration Drilling Project #1 (Emailed)
From
Oxbow Mining, LLC
To
DRMS
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o[ completing the Survey Ac constructing Exploration Access Roads. nrexploration <br />drilling or environmental monitoring <br />activities on the Properties. Any Exp Access Roads <br />s whenever possible. use existing gravel. dirt or two track roads to acces Explora <br />Drillhole Pad locations or Ground Water Well Monitoring Sites. I lowex when no appropriate <br />access roads exist, Oxbow may use a bulldozer to develop an Exploration Access Road. Uuieuo <br />otherwise agreed by the Parties, all Exploration Access Roads shall bc reclaimed by Oxbow ou <br />the conclusion ofitxacti,ibon Linder this Agreement. <br />4. Term. The mmo[thisAgreement shall commence asof the Effective Date and <br />shal I continue for a term of 5 years from the L ffectNe Date. Oxbow shall have periodic access <br />beyond this term as needed to monitor and if necessary repair reclaimed drillhole pads and <br />access roads that were constructed during this exploration process until all permit obligation are <br />satisfied and reclamation bonding held on these drillhole pad and road locations has been <br />released. Such access for reclamation i, generally completed within three growing seasons after <br />activities Linder the perrnit are completed, but may be longer i Crequired b� government <br />regulatory authorities. When this Agrccinent ceases to be in full force and effect. the Parties <br />shall execute any and all releases necessary me,iJ,noc the Fact that this Agreement ,haHn" <br />longer apply m the Properties. <br />8. Payments to James L. Patterson .1r. Family Trust / Lois M. Patterson Estate. <br />(u) Closing Payment. Uxbov shall pay James L. Patterson Jr. Family lium/ <br />Lois M. Patterson Estate a closing pa-Nmcnt in an arnount agreed to as shown on Exhibit B <br />relating vo the 20|| calendar year within 7 Business Days o[ the mutual execution o|'thix <br />Agreement. <br />(b) Fxploration Drillhole Pad Payment. Oxbow shall pay James LPmLermo <br />/:Fum|i} Trust / Lois M. Patterson (�atate the Exploration Dri|ih"|e Pad Payment agr tnvn <br />Exhibit ii per Exploration D,i\|ho|c Pad, Ground VVcxe, Well Monitoring Site, orother <br />environmental monitoring site developed during the exploration drilling pmuoa. <br />(C) Consideration. The nou[co agree that the sum of the payments described <br />(n subsections (a) and (b) above and shown ooExhibit B shall bc full consideration for all <br />surface use and access rights set forth in Section 2 and Section 3above. <br />6' {��aIg�1k�. Following the permanent ocsngiunwySupcyAubvibcnand <br />cxph,uuioomzhvidcs shall reclaim or restore the affected portion nY the Properties when <br />and as required by applicable law, rule or regulation and shall be responsible for the costs of such <br />reclamation resulting from the exploration drilling and construction of Exploration Driliholc <br />Pads nn the Properties. James L. Patterson Jr. Fumiiy]ium/ Lois M. Patterson Estate <br />acknowledges that state regulatory authorities will be required to access the reclaimed area to <br />vor|[ytholappnopriuirr*doma\ionaobvihomncournndu`anySxpinmdonAcocaRowJund <br />Exploration Dri|iho|cPad. Oxbow ubu|| also bc entitled tn such access in connection with the <br />foregoing activities. These activities may include. without limitation, `i»its tv the site /br <br />grading any erosion features, spraying for weeds nru,nccd[n&,{[uccc xmry,andrepulumry. <br />inspections. Oxbow agrees that it wil I endcavour to schedule these actN ities so as to minimize <br />interfierence with landowner or ranch activities on the Properties. but the Parties recognize that <br />the timing requirements of the applicable regulatory authorities may cause some disruption with <br />ranch or James LPuucmon Jr. Family Trust / Lois NI. Patterson Estate ocx[vihco. <br />=4HH95��``op <br />
The URL can be used to link to this page
Your browser does not support the video tag.