Laserfiche WebLink
34 <br />1 MS. TURNER: I'm sorry. I just have <br />2 one question. We were instructed that the only <br />3 thing we were permitted to talk about is absolute <br />4 things that deal with PR 06. None of this relates <br />5 to PR 06. <br />6 MR. KAMPER: It's just background <br />7 information, Mr. Chairman. <br />8 MR. PAULIN: Thank you. <br />9 MR. KAMPER: Thank you. <br />10 MR. LEWICKI: My name is Greg <br />11 Lewicki. I'm a mining and reclamation engineer <br />12 that's been working with the division for 30 years <br />13 now, and I started working on this project in the <br />14 late 1990s with the revision to add the lands west <br />15 of 2700 Road to the mine permit. <br />16 And the issues that we are covering <br />17 based on the prehearing conference, the number one <br />18 issue was the postmining land use, which has been a <br />19 subject of the formal protests. <br />20 Part of what you're going to hear <br />21 today is that some of the land was not put back to <br />22 irrigation that was irrigated before. <br />23 As part of PR 6, the division <br />24 requested that we go through the water availability <br />25 for each parcel west of 2700 Road, and using the <br />