Laserfiche WebLink
Mr. Eric Scott <br />September 12, 2012 <br />Page Two of Three <br />4. Exhibit L - Reclamation Costs (Rule 6.4.12) <br />The Applicants reclamation cost estimate should be based on the actual cost to <br />reclaim the site as it currently exists, not on a hypothetical alternative reclamation <br />plan. That said the Applicant's cost ($0.85 /cubic yard) to "grade" is both <br />inaccurate and inadequate to "remove" the shale stockpiles from their present <br />location and properly reclaim the affected land. Therefore, the total bond amount <br />must reflect the true cost of reclamation at this site. <br />Please do not hesitate to call me at (303) 444 -6602 with any questions regarding this <br />letter. <br />Sincerely, <br />Copied electronically to: Kenneth and Judith Schell, Objectors <br />Michael J. ike) Hart <br />