My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-27_PERMIT FILE - C2009087A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2012-08-27_PERMIT FILE - C2009087A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2018 10:19:58 AM
Creation date
9/17/2012 1:21:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
8/27/2012
Doc Name
Hydrologic Information
Section_Exhibit Name
Exhibit 2.04.7-E1 Hydrology Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form No. OFFICE OF THE STATE ENGINEER <br />GWS -25 COLORADO DIVISION OF WATER RESOURCES <br />818 Centennial Bldg., 1313 Sherman St., Denver, Colorado 80203 <br />!3031866 -3581 <br />APPLICANT <br />1448 <br />WELL PERMIT NUMBER 284387 <br />DIV. 6 WD 57 DES. BASIN MD J <br />APPROVED WELL LOCATION <br />ROUTT COUNTY <br />SE 114 NE 1/4 Section 32 <br />SAGE CREEK COAL COMPANY LLC Township 6 N Range 87 W Sixth P.M. <br />29515 ROUTT CR 27 DISTANCES FROM SECTION LINES <br />OAK CREEK, CO 80467- 1716 Ft. from North Section Line <br />1210 Ft. from East Section Line <br />(970) 870 -2751 UTM COORDINATES (Meters.Zone:13.NAD83) <br />PERMIT TO CONSTRUCT A WELL casing: sioitil Nortrnng: 44ftl4 /3 <br />ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT Page 1 of 2 <br />CONDITIONS OF APPROVAL <br />1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit <br />does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from <br />seeking relief in a civil court action. <br />2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402 -2, unless approval <br />of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation <br />Contractors in accordance with Rule 18. <br />3) Approved pursuant to CRS 37- 92- 602(3)(b)(1) for uses as described in CRS 37- 92- 602(1)(f). Use of this well is limited to <br />monitoring water levels and/or water quality sampling. This well is known as ccu011mw. <br />4) This well must be equipped with a locking cap or seal to prevent well contamination or possible hazards as an open well. <br />The well must be kept capped and locked at all times except during sampling or measuring. <br />5) Records of water level measurements and water quality analyses shall be maintained by the well owner and submitted to <br />the Division of Water Resources upon request. <br />6) Upon conclusion of the monitoring program the well owner shall plug this well in accordance with Rule 16 of the Water <br />Well Construction Rules. A Well Abandonment Report must be completed and submitted to the Division of Water <br />Resources within 60 days of plugging. <br />7) The owner shall mark the well in a conspicuous place with the well permit number and name of aquifer as appropriate, <br />and shall take necessary means and precautions to preserve these markings. <br />8) This well must be constructed by or under the supervision of a licensed well driller or other authorized individual according <br />to the Water Well Construction Rules. If non - standard construction is anticipated, a variance request must be submitted in <br />accordance with Rule 18 and approved prior to well construction. <br />9) A Well Construction and Test Report (Form GWS -31), including lithologic log must be submitted by the individual <br />authorized to construct the well. For non - standard construction, the report must include an as -built drawing showing <br />details such as depth, casing, perforated zones, and a description of the grouting type and interval. <br />10) This well shall be constructed not more than 200 feet from the location specified on this permit. <br />NOTE: Issuance of this permit does not guarantee that this well can be converted to a production well under a future <br />permit. Additionally, pursuant to Rule 14.2 of the Water Well Construction Rules (2 CCR 402 -2), monitoring holes <br />constructed pursuant to a monitoring hole notice shall not be converted to a production well. (Upon obtaining a permit from <br />the State Engineer, a monitoring hole may be converted to a monitoring well, recovery well for remediation of the aquifer, or <br />a dewatering system for dewatedng the aquifer.) <br />(APPROVED <br />SMJ _�"Qua.4 <br />State En By <br />,Receipt No. 3647656 DATE ISSUED 1n_96an1n FXPIRaTIn n T <br />
The URL can be used to link to this page
Your browser does not support the video tag.