My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_PERMIT FILE - C1981010 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2012-08-24_PERMIT FILE - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:50 PM
Creation date
9/17/2012 11:09:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
8/24/2012
Doc Name
Annual Report
Section_Exhibit Name
Appendix W 2011 Report Section 1.0 to 7.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2.7 Re- Disturbed Reclamation Acres <br />The parcel identification and acres re- disturbed due to mining activities for all previously <br />revegetated areas will be documented here. Table 1.2 will show acres re- disturbed and <br />summarize the bond release status of each parcel. <br />During the summer of 2001 Parcel H -B -94 was re- disturbed for a dragline walk road. The re- <br />disturbance totaled 8.5 acres of Phase I and II bond released lands. <br />During the summer of 2007 Parcels A -C -866 and A -B -86 were re- disturbed at 1.6 and 4.3 <br />acres respectively. These two parcels had received Phase III bond release. These parcels <br />were at the North end of Derringer pit and were removed for further mining of shallow reserves <br />in the area. <br />Also in 2007, Parcel A -A -00 was completely removed at 4.7 acres and part of Z -AB -05 was re- <br />disturbed at 2.6 acres for a haulroad into Flintlock pit. Neither parcel had attained any level of <br />bond release. <br />In the spring of 2008 a portion of A -13-00 was re- disturbed due to a small landslide that <br />destroyed a section of LOM road and Middle Z road near the ANFO silos. The area <br />subsequently stabilized and reclaimed below LOM road. The 3.1 acres that were disturbed <br />had attained Phase II bond release <br />Also in 2008 a small sliver of A -B -98 was re- disturbed at 0.2 acres for a power cable route <br />north of Flintlock pit. It had attained Phase I release. <br />In 2009 1.7 acres were re- disturbed for the northern edge of the East Panel Ready Line <br />construction. Parcels Z -AB -05 (0.3ac), Z -AB -06 (0.1 ac), Z -A -07 (0.8ac), and Z -A -08 (0.5ac). <br />The first three parcels had attained Phase I bond release for a total Phase I re- disturbance of <br />1.2 acres. <br />In 2011 0.9 acres of Phase I bond release was re- disturbed in Z -AB -05 to widen the F -3 <br />Haulroad to Flintlock pit. <br />FVUBDN /GCR 7/12 <br />[DRMS \11 RECtextt -0] <br />
The URL can be used to link to this page
Your browser does not support the video tag.