My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-10_REVISION - M1982090 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982090
>
2012-09-10_REVISION - M1982090 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:05 PM
Creation date
9/14/2012 1:17:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982090
IBM Index Class Name
REVISION
Doc Date
9/10/2012
Doc Name
RESPONSE
From
REARDON STEEL
To
DRMS
Type & Sequence
TR4
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Oswald/M -1982- 090 /TR -04 <br />September 10, 2012 <br />Page 3 of 6 <br />feet per second at flow rates of 1,000 to 3,000 gallons per minute (gpm) respectively. Although the <br />relatively low flow velocity at the pipe outfall doesn't warrant energy dissipation, CBCI will armor <br />the segment of the pond embankment that receives the discharged flows with geotextile liner and <br />clasts >2 feet wide. This armament will ensure the long term stability of the embankment as it is <br />constantly inundated by the discharge. Figure 4 shows how the discharge pipe outlet will be sloped <br />and elevated with respect to the pond. <br />DRMS: Does the length of time water is detained in the sediment pond depend on the <br />permeability of the earthen material lining the pond structure, or on the CMP outfall pipe <br />itself? (Or does the residence time depend on both of these factors ?) <br />CBCI: The calculated detention time included in the TR submittal assumes that there is no loss to <br />percolation through the earthen material, and that the flow rate, volume capacity of the pond, and the <br />elevation of the outfall of the pond are the only factors in determining detention time. Due to the fact <br />that the pond was never equipped with a synthetic or clay liner there is a possibility of loss to <br />percolation. The potential loss to percolation cannot be calculated at this time because the hydraulic <br />conductivity of the earthen material and limestone liner is not known. However, previous operators <br />have stated that the inflow rates and outflow rates of the pond during previous operations were <br />identical, which indicates that loss to percolation, if any, was not measureable. Also, based on the <br />historic discharge permit files, there is no indication from regulators overseeing the discharge that <br />there was a change in flow rates when flows were measured at the portal (prior to pond construction) <br />or when flows were measured at the pond outfall. <br />DRMS: If the volume of detention time of the water in the sediment pond depends on the <br />outfall pipe, please provide design information about the planned elevation of the outfall pipe <br />and the elevation of the water surface at pond capacity. A cross - section diagram will be helpful <br />here also. <br />CBCI: Until excavation of the pond is complete, CBCI will not know the exact slope and depth of <br />the historic sedimentation pond that is proposed to be replicated. Based on the historic discharge <br />permit files and statements made by previous operators, CBCI is anticipating that the capacity of the <br />pond will be the equivalent volume of 12 hours of storage at a flow rate of 1,000 gpm (assuming no <br />loss to percolation). Based on volumetric modeling (Figures 2, 3, and 4), the appropriate elevation to <br />meet the design capacity (720,000 gallons for 12 hour detention time @ 1,000 gpm) is 9,748 feet. <br />The outfall pipe (36" CMP) will be elevated so that the bottom of the pipe will be at 9,748 feet. To <br />ensure controlled overflow in the event that the outfall pipe is blocked, a 6" thick concrete cap, with <br />wings sloping down from the up- gradient earthen dam, will be constructed above the outfall pipe to <br />protect the integrity of the pipe and earthen dam in the event of overflow (see Figure 5). This <br />overflow feature will be elevated 3.5 feet above (elev. 9,515.5 ft.) the designed capacity level, and <br />will be the lowest point of the pond along the earthen dam (other than the underlying discharge pipe). <br />The modeled contours in Figure 2 and the profile views in Figures 3 and 4 provide a conceptual view <br />
The URL can be used to link to this page
Your browser does not support the video tag.