AMEC observed anchor trench excavation and backfill for the Phase 5 Berm Raise. <br />AMEC inspected and approved subgrade for geomembrane deployment at the Phase 5 Berm Raise. <br />AMEC observed, logged data, and assisted in the installation of geomembrane at the Phase 5 Berm <br />Raise. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />None <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on August 28, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />AMEC: <br />Daily toolbox safety meeting were attended by AM EC personnel. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />amecs <br />We trust the information provided clearly represents our findings and observations for the week ending <br />September 1, 2012. <br />Joseph Hickey, CQA Moni <br />Approved By: T.1 Date: f° <br />Date: September 1, 2012 <br />P5BR.Weekly Report WE 09.01.2012 <br />