Laserfiche WebLink
Days <br />S <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D- <br />D <br />D <br />D <br />D <br />D- <br />D = Day Shift N = Night Shift <br />PHASE 5 BERM RAISE FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 Berm Raise <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 Berm Raise <br />Date: September 1, 2012 <br />Reporting Period: 8/25/2012 through 9/1/2012 <br />Ambient Temperature Range (F): Low: 47 °F to 54 °F ( + / -) High: 70 °F to 78 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: None <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) Subgrade Preparation <br />A CAT 663 vibratory smooth drum compactor was used to compact subgrade at the Phase 5 <br />Berm Raise. The subgrade surface was moisture conditioned using a tandem axle water truck <br />(when necessary) and compacted with at least 4- passes. Subgrade was inspected and accepted <br />by an AMEC field representative for soil liner fill placement. <br />Subgrade was inspected and approved by an AMEC field representative prior to Soil Liner Fill <br />placement. <br />B) Select Structural Fill Placement <br />No work performed during the week. <br />C) Slope Contouring <br />No work performed during the week. <br />D) Site Grading <br />No work performed during the week. <br />amee <br />Project No.: 74201125K0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />E) Soil Liner Fill (SLF) <br />Soil liner fill (SLF) placement was performed. Subgrade was approved and moisture conditioned <br />prior to placement using a tandem -axle water truck. Placement was performed using a CAT 304 <br />mini excavator, a CAT 312 excavator, a Bobcat skidsteer and a John Deere 120 excavator in a <br />one -foot compacted lift. SLF material was previously hauled to a temporary stockpile near the site <br />from the East Cresson SLF stockpile using CAT 40 -ton articulating haul trucks loaded by a CAT <br />988 front -end loader. A CAT 950 front -end loader hauled SLF material from the temporary <br />P5BR.Weekly Report WE 09.01.2012 <br />