Laserfiche WebLink
MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />September 11, 2012 <br />Brock Bowles <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 RECEIVED <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine SEP 1 <br />TR -75, As -built configuration for Gob Pile #4 3 2012 <br />Permit C- 1996 -083 Division of Reclamation, <br />Dear Mr. Bowles: Mining & Safety <br />On behalf of Bowie Resources, LLC, (BRL), and per DRMS request, enclosed is an application for a <br />technical revision to incorporate the as -built configuration and volume for gob pile #4 into the permit. <br />An aerial survey of the area was conducted at the end of May 2012, and the requested information was <br />generated based on that survey. <br />SurvCADD 2011 calculated the as -built volume of gob pile #4 to be 500,000 CY. The as -built topography <br />and drainage configuration are shown on the included maps. There were minor revisions made to the <br />sedimentation control plan for ponds D and F. <br />An updated stability analysis has been provided by Buckhorn Geotech and is included for review. Text in <br />Volume IX has been revised as necessary to reflect the as -built configuration of gob pile #4. <br />The following revised permit pages and maps are enclosed. <br />Volume II <br />Volume III <br />Volume IX <br />Pond F changes: Ditches F -7, 7a, 11, 13, 14, 16, 20, 21, 22 & 23 and Culverts F2 and F3. <br />Pond D changes: Ditches D -3, 6, 7, 8 &9. Culvert G -3. <br />PHC for Ponds F and D <br />Sincerely, <br />4tUlx t - f �- <br />Ta mme Bishop, P.E. <br />Project Engineer <br />Cc: BLM <br />Bill Bear <br />J. E. STOVER & ASSOCIATES, INC. <br />2352NORTH 7 STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />Maps 15 -3, 18, 20, 21 -3, 22 -C <br />Pages Exh. 8 -17 to 8 -19i, 8 -29i, 31, 74ix, 74xi, 207, 208 and Exh. 8 -246 to <br />262. <br />Figures 1, 2, 3 <br />Text pages: 1,3,4,14, Appendix A, Exh. B -1 to 9, 18, 18i, 22, 25, 27, 30i- <br />30iv, 31, 31 i, 33, 35 -45, Stability Analysis. <br />