My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-06_REVISION - M2008070 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008070
>
2012-09-06_REVISION - M2008070 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:46 PM
Creation date
9/13/2012 12:42:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
Revision
Doc Date
9/6/2012
Doc Name
AM-01, DPHE REGULATIONS PERTAINING TO SOLID WASTE SITES & FACILITIES
From
WESTERN GRAVEL
To
DRMS
Type & Sequence
AM1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />• <br />• <br />LI <br />(2) The department may, on a case -by -case basis and upon <br />demonstration of need consistent with section 25 -15- 301.5, request <br />a waiver of the ceiling fee from a solid waste site and facility subject <br />to the document review and activity fee. <br />DOCUMENT REVIEW AND ACTIVITY FEES SCHEDULE <br />Task <br />Ceiling Fee <br />Notification/Registration/Bonds <br />$1,000 <br />Certificate of Designation Application <br />$35,000 <br />Design and Operation Plan Modification <br />$25,000 <br />Construction CQA Report <br />$5,000 <br />Ones Own Waste Design & Operation <br />Plan <br />$35,000 <br />Audit Reports <br />$5,000 <br />Financial Assurance — Annual <br />$3000 <br />Financial Assurance— 5 yr <br />$5000 <br />Monitoring Reports (e.g., groundwater <br />landfill gas, remediation's <br />$3,000 <br />Corrective Action, Remediation & Pilot <br />Project Plans (e.g., gas, groundwater, <br />geotechnical, storm - water, site visit, <br />meetings etc. <br />$10,000 /calendar year <br />Closure Plans and modifications <br />$5,000 <br />Post - Closure Plans and modifications <br />$5,000 <br />Transfer Station Operating Plan <br />$10,000 <br />Asbestos Contaminated Soil Facilities <br />$15,000 /area /calendar <br />year <br />Compost Facility Design & Operation <br />Plan <br />$15,000 <br />General Correspondence <br />$500 <br />Special Requests <br />$10,000 <br />June 30, 2011 <br />38.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.