Laserfiche WebLink
Feb.11.2011 01:19 PM <br />MIL.; ut U L UUN 1 Y ROAD AND PERMIT <br />DEPT. <br />RIGHT-OF-WAY ACCESS 1 ERMIT <br />:x^ PERMTTTEFa2 WQStprn Gr.?tr <br />So 8O8 Meeker CO 81 641 <br />PURPOSE OF THIS ACCESS (summer or full -time residence, utility location, etc): <br />by <br />See Attached <br />APPROVAL TO CONSTRUCT ACCESS ACCORDING TO THE SPECIFICATIONS NOTED ABOVE: <br />Authorized County Representative <br />PAGE. 2/ 5 <br />PERMIT NUMBER: <br />ROAD NUMBER: <br />DIST JCT NO; <br />SUPERVISOR; <br />DATE ISSUED: <br />Telephone 97 —82.8_— 55.64' <br />Is hereby requesting permission to construct and use an access to a county right -of -way at the Ideation noted below. The access shall be constructed, <br />maintained and used in accordance with the terms and conditlorts of this permit including fisted attachments. Sketch shall include frontage of lot along road, <br />distance from Centerline of road to property line, number of driveways requested, width of proposed driveways) and angles, distance from building(s) and /or <br />other facilities. <br />The applicant binds and obligates himself to construct and maintain the right -of -way access(es) in accordance with the provisions, specifications, and Conditions <br />enumerated in this document. <br />The issuing authority may revoke this permit if at any time the permitted access and its use violate any of the terms and conditions of this permit. <br />LOCATION (Please indicate county road and nearest mite post or address if one axrsts): <br />RBC Rd 5 Nearest Mile post is 42 <br />To provide access to proposed WRC Gravel Pit <br />SKETCH: This permit shall he made available at the site where and when work is being done. A work sketch or Crewing of the proposed dnveway(s) must accompany application. <br />Proposed location must be marked or flagged before submitting this form, <br />, 3ENSRAri EgovtZTONS: (See reverse for Speeiticat},oael <br />1. The Applicant represents all parties in interest, and affirms that the driveway approach(es) is to be constructed by him for the bona fide purpose of securing <br />ac to.his property and not for the purpose of doing busine ee or servicing vehicles on the right -of -way. <br />Applicant shall furnish all labor and materials, perform all work, and pay all Costs in connection with the construction of the drlveway(s) and its <br />a 't anges on the right -of -way. All work shall be completed In an expeditious and safe manner and shall be finished within 30 days of the Permit date. <br />3. 'i :,e type of construction shall be as designated and /or approved by the Road Department and all materials used shall be of satisfactory quality and subject to <br />inspection and approval of the Department. <br />4. The travelling public shall be protected during the installation with proper warning signs and signals and the Department and Its duly appointed agents and <br />employees shall be held harmless against any action for personal Injury Or property damage sustained by reason of the exercise of the Permit, <br />5. No revisions or additions snail be made to the driveways) or its appurtenances on the right -of -way without the written permission of the Department. <br />5. Provisions and specifications outlined herein shalt apply on all roads under the jurisdiction of the Department. <br />7. Staking or flagging access boundaries is required prior to approval. <br />13, This permit does not allow any damage to occur On the existing county right -of -way. If Permittee causes damage to the county road, Permittee shall repair <br />road to the county's satisfaction. <br />4, All driveways permitted must have 6" of %" road base on the surface from the point it intersects the county road to the edge of the county road right -of -way. <br />OTHER TERMS AND CONDrrrg1ss: <br />FEE $65.0Q <br />Upon signing thie permit the Permittee agrees to the terms and conditions and referenced attachments contained herein The permitted access shall be <br />completed in accordance with the terms of the permit prior to being used. The Permittee shall notify the District Supervisor with the Rio Slando County <br />Road and Bridge Dept immediately upon completion of the installation, At that time a representative will inspect driveway access for compliance. If <br />construction is not to the specification herein required, the County shall notify the Permittee and corrections shall be made immediately. If <br />corrections are not made to the satisfaction of the County, the access shall be removed. <br />The person signing as the Permittee must be the owner or legal representative of the property served by the permitted access and have full authority to accent <br />the permit and all its terms an. ions, <br />Data <br />Data T1t1s <br />This permit is not valid until signed by a duly authorized representative of the Department. <br />RIO BLANCO COUNTY ROAD AND BRIDGE DEP4iMENT <br />Meeker District 570 - 2nd Street Meeker, Colorado 81641 pro 878 - Q Fex (970) 878 -3396 <br />Rangely District; 'f7497 Hwy. 64 Rsrrgely, Colorado 8160 (970) 67'6.3644 Fax {S70) 675 -8648 <br />efr - 154.5 <br />