Laserfiche WebLink
Soil Balance Calculations <br />Western Gravel E & P Waste Disposal Facility <br />NWCC INC. <br />JANUARY, 2011 <br />Facility <br />Subgrade Construction (yd) <br />Operations Layer <br />(yd3) <br />Interim Daily <br />Cover (yd3) <br />Final Soil over [3'/2'j <br />(yd3) <br />Vegetative Layer [6 "] <br />(yd3) <br />Fill <br />Cut <br />Cell A <br />15,000 <br />- <br />6,200 <br />21,000 <br />22,150 <br />3,150 <br />Cell B (Future) <br />15,000 <br />- <br />4,600 <br />15,450 <br />16,400 <br />2,300 <br />Cell C (Future) <br />15,000 <br />- <br />3,400 <br />12,000 <br />12,200 <br />1,700 <br />Cell D (Future) <br />6,600 <br />26,500 <br />3,100 <br />10,500 <br />11,100 <br />1,600 <br />Cell E (Future) <br />4,000 <br />28,000 <br />3,400 <br />12,000 <br />12,200 <br />1,700 <br />Pond 1 <br />100 <br />5,000 <br />- <br />Pond 2 <br />15,000 <br />1 - <br />- <br />TOTALS <br />70,700(l) <br />1 59,500 (3) <br />20,700 (1) <br />70,950 <br />74,050(l) <br />10,450 (2) <br />Total Fill Required (') = 236,400 yd3 <br />Total Top -Soil Required (2) = 10,450 yd3 <br />Total Materials Required= 246,850 yd3 <br />Soils Available from Phase 2 @ 6' deep <br />111 acres x 43,560 ft2 /acre = 29,010,960 ft3 <br />= 1,074,480 yd3 <br />Subgrade Cut Materials Available (3) = 59,500 yd3 <br />Total Materials Available = 1,133,980 yd3 <br />Surplus Material = 887,130 yd' <br />F \Jobs \10 -8718 Western Gravel E &P Disposal Facility\Engineering\Design Phase I\Design Calculations \Soil Balance Calculations <br />