My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-06_REVISION - M2008070 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008070
>
2012-09-06_REVISION - M2008070 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:46 PM
Creation date
9/13/2012 12:29:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
Revision
Doc Date
9/6/2012
Doc Name
AM-01 DESIGN & OPERATIONS PLAN, PROPOSED WASTE DISPOSAL FACILITY
From
WESTERN GRAVEL
To
DRMS
Type & Sequence
AM1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design and Operations Plan October 24, 2011 <br />Western Gravel E & P Waste Dis osal Facility Page 49 of 51 <br />levels must be maintained at less than a one foot depth, LCRS monitoring must be adjusted in order <br />to adequately manage leachate. In the event that leachate no longer poses a threat to human health or <br />the environment (no leachate generation), the owner may request less frequent or cessation of <br />leachate monitoring. <br />• Leak detection system will be monitored on a quarterly basis for the presence of liquid. In the event <br />that liquid is discovered, procedures previously discussed will be implemented. LDS and LCRS will <br />be monitored concurrently. <br />• Landfill gas will be monitored on a quarterly basis in accordance with procedures previously <br />discussed. <br />During the post- closure care period, the facility owner may be contacted regarding facility concerns. Current <br />post - closure facility contact information is provided in Section 1.2. Following completion of the post - <br />closure care period, the owner or operator will notify CDPHE that a certification signed by an independent <br />Colorado registered professional engineer or approved by CDPHE and the local governing body having <br />jurisdiction, verifying that post - closure care has been completed in accordance with the post - closure plan has <br />been placed in the operating record. The final post- closure certification report shall be submitted to CDPHE <br />for review and approval for final release of financial assurance. <br />NWCC, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.