My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-11_REVISION - C1980005 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2012-09-11_REVISION - C1980005 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:49 PM
Creation date
9/13/2012 10:07:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Revision
Doc Date
9/11/2012
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Seneca Coal Company
Type & Sequence
SL5
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 001 Page 2 of 4 <br />Task description: <br />Site: Seneca II Mine <br />PROJECT IDENTIFICATION <br />SCRAPER TEAM WORK <br />foil on 219.7 Acres <br />Permit Action: SL5 <br />Task #: 001 State: Colorado <br />Date: 7/19/2012 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraper Work Team <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment Maintenance Equipment <br />Total work team cost /hour: $1,98.64 <br />MATERIAL QUANTITIES <br />Initial volume: 263,780 CCY Swell factor: 1.102 <br />Loose volume: 290,686 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />$39.30 <br />$21.46 <br />Operating cost /hour: <br />$232.77 <br />NA <br />NA <br />NA <br />$16.78 <br />$11.46 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />$80.54 <br />$71.62 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,446.48 <br />Support: <br />$0.00 <br />Maint: <br />$152.16 <br />Total work team cost /hour: $1,98.64 <br />MATERIAL QUANTITIES <br />Initial volume: 263,780 CCY Swell factor: 1.102 <br />Loose volume: 290,686 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis <br />Material weight: <br />2,075 lbs/LCY <br />Material description: <br />User Provided <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />39.33 LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />Permit/Job #: C1980005 <br />Abbreviation: None <br />Filename: C005 -001 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.