Laserfiche WebLink
Page 2 of 2 <br />New Elk did not submit the compaction test results with the Fourth Quarter Waste Bank Inspection <br />Report. The rules do not require these tests to be submitted with the report, but to ensure that the New <br />Elk Coal Company is meeting the minimum compaction requirements, compaction test results would be <br />necessary. It is recommended that future reports include these tests. <br />New Elk Coal Company's response to DRMS' letter of July 13, 2012, addressed all issues noted in the <br />July 13, 2012 letter. Compaction tests for each of the waste banks inspected were included with this <br />document and meet all minimum requirements. <br />Sincerely, <br />Janet Binns <br />Environmental Protection Specialist III <br />(303) 866 -3567 ext. 8107 <br />