My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-10_REPORT - M2007044
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2007044
>
2012-09-10_REPORT - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:48 PM
Creation date
9/12/2012 12:36:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
REPORT
Doc Date
9/10/2012
Doc Name
ANNUAL FEE/REPORT
From
ENERGY FUELS RESOURCES
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Groundwater was monitored on a bi- monthly basis from October 2008 through April <br />2010 to establish baseline conditions. Annual sampling of the well began in June 2010. <br />These activities and sample results were reported quarterly to DRMS. <br />Surface and Stormwater Discharge Permits <br />• The water treatment plant ran intermittently as needed (approximately 100,000 gallons <br />per month) and discharge sampling was conducted in accordance with the permit <br />conditions and reported monthly to the Water Quality Control Division (WQCD) until <br />December 2009 when water treatment and discharge were temporarily suspended. <br />• Stormwater inspections were conducted on a monthly basis and reported to WQCD in <br />annual stormwater reports. <br />Conditional Water Rights Ruling <br />• Water Usage from the Mine was calculated on monthly basis and reported to Colorado <br />Division of Water Resources (DWR) and copied to DRMS annually. <br />Air Emissions Permits <br />• Three air emissions permits received final approval from the Air Pollution Control <br />Division (APCD) between March 31 and April 9, 2010. <br />• Estimated air emissions are calculated on a monthly basis and are reported to APCD upon <br />request. <br />Spill Prevention Control and Countermeasure (SPCC) Plan <br />• The Above Ground Storage Tanks (ASTs) on -site are inspected monthly. <br />Radon Monitoring <br />• An "Approval for Construction" was granted by the U.S. Environmental Protection <br />Agency (EPA) and copied to DRMS in August 4, 2011. Radon monitoring and modeling <br />are completed in accordance with the approval conditions and submitted to the U.S. EPA <br />on an annual basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.