Laserfiche WebLink
Piezometer <br />Date <br />Depth to Water <br />(feet) <br />Total Depth (ft) <br />Volume of <br />Water (ft) <br />P12 <br />8/30/12 <br />41.69 <br />41.71 <br />0.02 <br />P13 <br />8/30/12 <br />40.94 <br />41.34 <br />0.40 <br />P14 <br />8/30/12 <br />Dry <br />41.24 <br />0.00 <br />P15 <br />8/30/12 <br />40.89 <br />41.10 <br />0.21 <br />Date <br />Quantity <br />Sludge Management <br />October 2011 <br />87.5 tons <br />Sludge transferred from Pond #3 to drying <br />pad. <br />August 2012 <br />87.5 tons <br />Sludge transferred from drying pad to tailings <br />impoundment. <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M -88 -112 <br />August 2012 Monthly Report <br />Page 3 <br />Table 2 — August 2012 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Table 3 below provides the calendar year 2012 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) 379 - <br />07, 8 or Mr. Larry Fiske (303) 837 -5676 <br />S erely, <br />Jtiiio F. Madrid <br />Sr. Supervisor Legacy Sites Reclamation and Closure <br />Cc: Larry Fiske <br />File <br />