Laserfiche WebLink
Sunnyside Gold Corporation - Sunnyside Mine / Mayflower Mill <br />MLR Report <br />1996 <br />Site: CC1 <br />Parameter - >in units of mg /I unless noted ++++++++++++++++ + + + + + + +4+ + + + + + + + + + + + +.1-+ + + + + +- <br />GPM C SU umho mg /I mg /I mg /I mg /I mg/1 mgfl tag /I <br />SAMPLE SITE Sampldate Qmgd Q(GPM) FieldT FieldpH FieldCond dAl dCd dCu dFe dPb dMn dZn <br />CC1A 09- Jan -96 0.10 4.80 3.61 460.00 5.70 0.02 0.40 0.42 0.44 3.46 5.82 <br />CC1A 13- Feb -96 0.28 4.50 3.18 600.00 6.70 0.03 0.47 2.37 0.41 6.41 8.30 <br />CC1A 11- Mar -96 0.54 4.58 3.20 530.00 5.20 0.02 0.39 0.55 0.34 3.46 5.64 <br />CC1A 15- Apr -96 0.51 5.40 2.88 400.00 6.41 0.02 0.56 3.50 0.14 4.80 6.04 <br />CC1A 08- May -96 12.96 6.20 3.54 200.00 2.98 0.01 0.38 6.29 0.02 1.44 2.52 <br />CC1 12- Jun -96 12.24 6.40 3.70 170.00 1.77 0.01 0.07 3.78 0.01 0.53 1.44 <br />CC -1 30- Jul -96 1.22 2.90 260.00 2.85 0.02 0.39 3.03 0.01 0:89 2.54 <br />CC-1B 12- Aug -96 0.67 12.00 3.89 210.00 2.02 0.01 0.14 0.20 0.02 0.75 2.47 <br />CC-1B 05- Sep -96 0.49 12.5 33.91 340.00 2.22 0.01 0.03 0.16 0.026 0.82 2.75 <br />CC-1B 23- Oct -96 0.99 4.00 4.01 280.00 2.89 0.006 0.332 2.00 0.012 1.01 2.92 <br />CC-1B 11- Nov -96 0.89 3 3.9 310 3.72 0.012 0.407 2.86 0.013 1.11 3.35 <br />CC-1B 02- Dec -96 0.72 4 4.75 300 2.94 0.012 0.247 0.25 0.012 1.02 3.39 <br />