Laserfiche WebLink
New Elk Coal Company <br />Permit C- 1981 -012 <br />One Exploration Hole <br />MR -107 is processed to obtain approval to drill three exploration holes south and <br />southeast of the mine facilities as shown on Map 20 Sheet 1. Two of the holes (NE -17 -12 &NE- <br />18-12) are located on DOW land. Exploration hole NE -01 -12 is located on the Applicants <br />property. Only one of the three holes was drilled. <br />The approved bonding required to seal reclaim the three drill holes: <br />Direct Reclamation Cost <br />$ <br />8,885 <br />Job Superintendent (75 hrs @ $58.56 ) <br />$ <br />4,392 <br />Profit, Insurance, Bond A 13.07% <br />$ <br />1,161 <br />Subtotal contract amount <br />$ <br />14,438 <br />Engineering 4.25% <br />$ <br />614 <br />Reclamation Management 5% <br />$ <br />722 <br />Total Reclamation Cost <br />$ <br />15,774 <br />The proposed bond to seal and reclaim the one hole (NE- 17 -12) that was drilled: <br />Direct Reclamation Cost <br />$ <br />3,141 <br />Job Superintendent 16 hrs $58.56 <br />$ <br />937 <br />Profit, Insurance, Bond 13.07% <br />$ <br />411 <br />Subtotal contract amount <br />$ <br />4,489 <br />Engineering 4.25% <br />$ <br />191 <br />Reclamation Management 5% <br />$ <br />224 <br />Total Reclamation Cost <br />$ <br />4,904 <br />The excess bonding posted for MR -107 $10,870 ($15,774 - $4,904) <br />MR -107 Exhibit 28- Page 231 Revised 04/20/12 <br />