Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56, PR3, MR95, MR 97 MR101)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Elk Coal Company <br />Permit C- 1981 -012 <br />New Structures and Geotech Work <br />MR -105 is processed to obtain approval to construct two buildings, drill five geotechnical <br />holes, construct light use roads, and incorporate a letter into the permit from CDPH &E regarding <br />use of flocculent. <br />The buildings are an office shop and pump house. The 100 foot by 50 foot office shop <br />will be constructed west of the preparation plant. The 12 foot by 12 foot pump house is located <br />below pond 1. <br />The five geotechnical holes are located at the west mine where a second development <br />waste disposal site may be proposed. The 6 inch diameter borings will be drilled to depths of 50 <br />to 70 feet. The light use roads, if necessary, will be constructed with a small track dozer. Light <br />use roads will only be wide enough to achieve safe access of the drill rig. A track mounted drill <br />rig will be used if one is available. Light use roads will not need to be constructed if a track <br />mounted drill rig is used. Approximately 675 feet of light use road construction is proposed. <br />Holes will be drilled from the light use roads so no drill pads will be required. <br />This document estimates the bonding required to seal the drill holes, fill in the test pits, <br />regrade the road and seed and much the area. In summary, the estimate is: <br />MR -105 Buildings & Geotech Holes <br />Total direct cost <br />$27,548 <br />Job supervision hours <br />16 <br />Job supervision cost <br />$0 <br />Profit, insurance, bond <br />$3,601 <br />Contract <br />$32,086 <br />Engineering <br />$1,364 <br />Reclamation management <br />$1,604 <br />Estimated bond <br />$35,053 <br />MR -105 Exhibit 28- Page 226 Revised 01/12/12 <br />