Laserfiche WebLink
New Elk Coal Company <br />Permit C- 1981 -012 <br />Install Slurry Line <br />MR -104 provides for the installation of an 8 inch inside diameter HDPE slurry line. The 9,000 <br />foot long slurry line extends from the preparation plant to slurry holes 2 and 3 located at the west mine. <br />This line will be laid on the surface except in areas where it will be buried to avoid roads and <br />other facilities. Exposed portions of the pipe will be heat taped to prevent freezing. <br />This document estimates the bonding required to remove the slurry line. <br />Remove Slurry Line <br />Item <br />Quantity <br />Unit Price <br />Cost <br />Remove 9,000 LF of 8" ID HDPE Pipeline <br />9000 <br />2.25 <br />$ 20,250.00 <br />Total direct cost <br />$ 20,250.00 <br />Job supervision hours <br />$ 4.00 <br />Job supervision cost <br />$ 234.24 <br />Profit, insurance, and bond al 3.07% <br />$ 2,646.68 <br />Contract = Direct + Overhead <br />$ 23,130.92 <br />Engineering 4.25% of Contract <br />$ 983.06 <br />Reclamation management 5.0% of Contract <br />$ 1,156.55 <br />Estimated bond <br />$ 25,270.52 <br />MR -104 Exhibit 28- Page 224 Revised 12/20/11 <br />