My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-31_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2012-08-31_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:17 PM
Creation date
9/10/2012 9:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
8/31/2012
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56, PR3, MR95, MR 97 MR101)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Elk Coal Company <br />Permit C- 1981 -012 <br />Conveyor Removal <br />MR -101 will provide for the installation of the conveyor system from the DWDA to the RDA. <br />The conveyor alignment is shown on Map 11, Sheet 3. <br />This document estimates the bonding required to remove the feeder breaker and beltline. <br />The estimate is $31,705 as detailed below: <br />Transfer Belt from DWDA to RDA Belt <br />Item <br />36" Belt <br />Elevating Belt <br />Belt Feeder <br />Length ft <br />500 <br />100 <br />35 <br />Width ft <br />3 <br />3 <br />12 <br />Depth/height ft <br />3 <br />3 <br />6 <br />Quantity <br />500 <br />100 <br />2520 <br />Units <br />LF <br />LF <br />CF <br />Unit cost <br />41.31 <br />41.31 <br />0.2257 <br />Total direct cost <br />$20,655 <br />$4,131 <br />$569 <br />Job supervision hours <br />2 <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />$117 <br />Profit, insurance, and bond 13.07% <br />$2,700 <br />$540 <br />$74 <br />Contract = Direct + Overhead <br />$23,472 <br />$4,788 <br />$760 <br />Engineering 4.25% of Contract <br />$998 <br />$203 <br />$32 <br />Reclamation management @5% of <br />Contract <br />$1,174 <br />$239 <br />$38 <br />Estimated bond <br />$25,643 <br />$5,231 <br />$831 <br />MR -101 Exhibit 28- Page 219 Revised 12/29/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.