Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />September 7, 2012 <br />Kurt Blunt <br />Colowyo Coal Company L.P. <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />Re: Colowyo Coal Mine (Permit No. C- 1981 -019) <br />Bond Release Application No. 6 (SL -06), Adequacy review <br />Dear Mr. Blunt: <br />COLORADO <br />Q I V I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The application for SL -06 was deemed complete for the purposes of filing on July 16, 2012, and the <br />bond release inspection of the site was conducted on August 8, 2012. DRMS staff have reviewed your <br />bond release application and the results of the inspection to determine whether the items you have <br />submitted are adequate in terms of meeting the requirements of the Act and Regulations. <br />During the inspection, some adequacy issues were identified with channels in the bond release area: <br />• In the North Tributary of East Pit Ditch there is a bare spot below the NTEP Pond. This <br />reach of the channel should have riprap armoring per the design in the PAP. However, there <br />is no erosion in the channel. <br />• In Prospect Ditch, in the reach between the ponds, the channel is not well shaped and is eroded. <br />Below the lower pond (PD 1) riprap is sparse in some areas. <br />• In Taylor Ditch, rock needs to be moved from the middle of the channel to the sides in some <br />areas. In other areas (near the bottom) riprap is sparse in the middle of the channel, and little to <br />no vegetation has grown in the channel. <br />• In Taylor Tributary Ditch, there are areas with sparse riprap in the middle of the channel. <br />However, this ditch is well vegetated. <br />Please let me know per e -mail or letter if these issues with channels have been addressed or not. If <br />maintenance has been performed, please let me know the details. For sites where no action has been <br />taken but maintenance is planned, please let me know the schedule. For sites where no action has been <br />taken and is not planned, please let me know why you think that no action is needed. In particular, if a <br />channel reach is deemed to be stable even though the construction of the channel does not meet the <br />design in the PAP, please provide evidence or rationale that this channel reach would be stable for the <br />design storm. <br />Regarding the assessment of the elevations in the bond release areas using GPS, after re- processing the <br />data there are no significant deviations between our data that we collected during the inspection on <br />August 8"' and the approved topography for your site. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />