My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-09-26_ENFORCEMENT - M1977378 (2)
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1977378
>
1988-09-26_ENFORCEMENT - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2021 8:48:46 AM
Creation date
9/7/2012 11:50:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
ENFORCEMENT
Doc Date
9/26/1988
Doc Name
Civil Penalty Pymts. of $12,200.00 and $500.00 with Supporting Docs.
From
Sunnyside Gold Corp
To
MLRD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 4 <br /> An inflow design flood hydrograph using a probable maximum thunderstorm <br /> 1-hour rainfall was prepared for proposed tailing pond No. 4. <br /> An inflow design flood hydrograph using less than a probable maximum <br /> thunderstorm 1-hour rainfall was prepared for abandoned tailings ponds <br /> No. 1 , No. 2, and No. 3. <br /> The design peak flood discharges, determined from the design hydrographs, <br /> were used to size diversion ditches that will divert surface runoff around <br /> the tailing ponds and to size culverts that will pass diverted runoff <br /> under State Highway 110. <br /> The design of the decant system for the proposed pond No. 4 was evaluated <br /> ,i <br /> to determine its capacity for passing storm water. <br /> 100-year design flood calculations, based on peak snowmelt runoff, were prepared <br /> i <br /> to estimate a design flood stage for the Animas River along the proposed i <br /> • I <br /> new alignment for State Highway 110. <br /> :SIGN FLOOD HYDROGRAPHS <br /> MESA guidelines recommend that both the probable maximum thunderstorm i <br /> � I <br /> hour duration and the probable maximum 6-hour general-type storm rainfall <br /> ;nflow design floods be prepared for tailing impoundments. However, for <br /> � 'Iis report, only the probable maximum thunderstorm design flood was considered. <br /> Tt is believed that it will be the more critical of the two types of inflow <br /> dg o Y <br /> esi n floods, because of the small size of the subject drainage <br /> very <br /> ,,teas (less than one square mile). <br /> The procedure used to compute the inflow design floods for the ungauged <br /> drainages at the site is based on that given in the Bureau of Reclamation' s <br /> 'Design of Small Dams". From the above reference, the probable maximum ' <br /> thunderstorm 1-hour point rainfall for the Silverton area is 8.5 inches.' <br /> i <br /> I �i ;spy <br /> 19 ";,i <br />
The URL can be used to link to this page
Your browser does not support the video tag.