Laserfiche WebLink
Surface Drainage Control Plan <br /> American Tunnel <br /> Standard Metals Corporation <br /> Silverton Operations <br /> The surface drainage control for the American Tunnel will adhere to the <br /> following guidelines: <br /> 1. To maintain existing surface drainage control ditches on site. <br /> 2. To construct and maintain surface drainage control ditches as proposed <br /> on the enclosed surface drainage control plan map. <br /> 3. To follow, where applicable, the criteria set forth in the 1976 <br /> Hydrological Design Data report by F.M. Fox and Associates, Inc. , for <br /> the tailings pond site, copy enclosed. <br /> 4. The placement of 18-inch to 36-inch diameter culverts where needed <br /> to allow access and drainage control. <br /> 5. The excavation of a suitable rock drain (French drain) at the toe area <br /> of the existing dump site. <br />