My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-02-12_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
2001-02-12_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2021 7:49:12 AM
Creation date
9/7/2012 6:52:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
2/12/2001
Doc Name
American Tunnel Bulkheads #2 and #3.
From
John F. Abel, Jr.
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
American Tunnel bu.Lkheads #2 & #3 Page io January 15, 2001 <br /> Appendix B. American Tunnel Bulkhead #3 design calculations (Continued) <br /> Hydraulic pressure gradient for trial 11-ft thick bulkhead: <br /> Low pressure grouting of concrete-rock contact but not rock, gradient allowable= 41 psi/ft <br /> (Garrett & Campbell-Pitt, 1958, Chekan, 1985, pl 1), with factor of safety of 4 <br /> American Tunnel Bulkhead#3, maximum pressure head <br /> Hyw 773(62.4) 335 <br /> P= 144 — 144 = PSl <br /> Required bulkhead length with low pressure grouting on concrete/rock bulkhead contact: <br /> L= a1 = 33' = 8.17ft <br /> 41 <br /> Pressure gradient with L= 11 ft pg = i = 311 = 30.5 psi/ft <br /> Factor of Safety against water leakage along concrete/rock contact around 11-ft thick <br /> bulkhead is: <br /> FS = 3015 = 1.34 <br /> American Tunnel Bulkhead #3 depth below surface (Z) required to prevent hydrofrac of rock <br /> around tunnel by 773-ft hydraulic head (335 psi pressure head): (Einarson& Abel, <br /> 1990) <br /> B,= 3Qin—a. =2Qo,,b =2Z(144) =2Z(i44)=2.403Z psi=335 psi <br /> Z = 2' = 139 ft <br /> Therefore, the planned location for the American Tunnel Bulkhead #3, between Station 3+67 <br /> ft and Station 3+82 inside the American Tunnel portal with a minimum overburden of 160 ft <br /> will not be subject to formation hydrofracturing. <br /> Concrete shear on American Tunnel Bulkhead #3 perimeter: <br /> fs = 2 f� =2,13 000 = 110 psi (ACI 318-95, Sec 11.3.1.1) <br /> pht _ 335(15)12 60300 = <br /> I'— 2(h4.0% — 2(12+15)110 — 5940 10.2 ft <br /> W=phQ = 335(15)12(144) = 8,683,000 lb <br />
The URL can be used to link to this page
Your browser does not support the video tag.