Laserfiche WebLink
Project Inspection Request <br /> Page 2 <br /> The existing Tailings Pond No.4 toe area was graded, through placement of fill material, <br /> to drain through the culvert under Hwy. 110 and shaped to accept a 19' wide—40 mil <br /> PVC liner. Subsoil excavated from SGC's borrow area behind Tailings Pond No.4 was <br /> used to create grade and ditch configuration. The 40-mil PVC liner was placed in the <br /> constructed ditch in 300-foot sections with an overlapping glued joint connecting <br /> sections. Approximately 2100 feet of liner material were placed. The liner was then <br /> covered with approximately 1 foot of overburden material and planted with SGC's Mined <br /> Land Reclamation approved seed mix for the area (seed mix attached). <br /> Please contact me if there are any questions on this completion certification or if any <br /> additional information is required to initiate an inspection request to DMG by the <br /> Division. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br /> CC: Wally Erickson, DMG <br />