Laserfiche WebLink
12. Prima future (Post- minin!) land use (check one): <br />11 Cropland(CR) Pastureland(PL) <br />F Rangeland(RL) n Forestry(FR) <br />11 Residential(RS) Fl Recreation(RC) <br />JJ Developed Water Resources(WR) <br />13. Primary present land use (check one : <br />0 Cropland(CR) Pastureland(PL) <br />• i <br />� Rangeland(RL) Forestry(FR) <br />Residential(RS) El Recreation(RC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer /Loader/Truck <br />15. On Site Processing: <br />16. Description of Amendment or Conversion: <br />Crushing/Screening <br />- 4 - <br />D <br />E <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Lincoln County is converting a current 110c Permit to a Regular 112 permit by adding 10.38 <br />acres to the pit. <br />