My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-05_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2012-09-05_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:39 PM
Creation date
9/5/2012 9:30:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
9/5/2012
Doc Name
Addition Information for Phase 1 Bond Release Application
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL6
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 Specific Reclamation Activities and Results <br />3.1 Phase I Areas <br />As shown on Exhibit 1, each area requested for bond release is comprised of smaller <br />units, which correspond to the specific year that backfilling and grading was <br />performed. The work completed includes regrading to the approved post- mining <br />topography and installation of post- mining drainage channels in required areas. <br />Grading and topsoil replacement is generally performed in the summer and fall <br />months. See Table 1- Summary of Reclamation Activities for an overview of the <br />worked performed for each reclaimed area. <br />The reclaimed areas have been regraded consistent with the approved post- mining <br />topography (See Map 19, Permit C -81 -019 for the approved post- mining topography) <br />and follow all criteria set forth for Phase I bond release by the Division. Please refer <br />to Exhibit 2A and 2B for seven (7) representative cross - sections of the regraded areas <br />in relation to the approved post- mining topography. Two of the seven cross - sections <br />have been components of the Annual Reclamation and Hydrology Report, and have <br />been subject to various reviews and approvals by the Division and the third through <br />seventh have been added to provide a representative cross - section of the West and <br />East Pit respectively. The cross - sections indicate that the Phase I areas fall within <br />the Division's guidelines of a maximum variance of 1/2 of a contour from the approved <br />post- mining topography and are well within acceptable mining practice. <br />Permanent and temporary channels have been established in the Phase I areas, in <br />accordance with the approved sediment control plan located in Permit C -81 -019. <br />These channels are identified in Exhibit 1 and cross - sections of the constructed <br />ditches are located in Exhibit 3A, 3B, and 3C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.