My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-04_PERMIT FILE - X201023101 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201023101
>
2012-09-04_PERMIT FILE - X201023101 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:24 PM
Creation date
9/4/2012 12:46:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201023101
IBM Index Class Name
PERMIT FILE
Doc Date
9/4/2012
Doc Name
Final Reclamation Report
From
Peabody Sage Creek Mining, LLC
To
DRMS
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hayden, CO 81639 <br />a) <br />b) <br />c) <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />COAL EXPLORATION FINAL RECLAMATION REPORT <br />Prospector: Sage Creek Holdings, LLC <br />Address: 36633 Routt County Road #27 <br />PO Box 250 <br />1. Attach a map showing: <br />Notice of Intent No.: X- 2010- 231 -001 <br />Project Name: 2010 Sage Creek Exploration <br />County: Routt <br />Date: August 22, 2012 <br />This report is filed in accordance with Rule 2.02.6(3)(b) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34 -33 -101 et seq. This report is to be submitted within 30 <br />days after the end of the period of exploration specified in the approved Notice of Intent, as <br />amended. <br />The final locations of all holes drilled during this project; <br />the locations of all roads modified or constructed for the project; and <br />All areas significantly disturbed by the operator. <br />2. Have all disturbed areas, including drill holes, been reclaimed in accordance <br />with the approved plan and the above - referenced regulations? Yes <br />3. Were any newly constructed project roads retained for the landowner? No <br />If yes, a) attach a letter from the landowner that grants consent, b) indicate the <br />road location on a map, and c) describe the approximate specifications of the <br />road (width, length, surface material used). <br />4. Did any drill holes experience surface artesian flow conditions? Yes <br />If yes, locate these holes on a map and describe sealing and plugging procedures <br />that were used. <br />5. Were any drill holes converted to a water well? No If yes, list the State <br />Engineer's Well Permit Number and name and address of the user. <br />
The URL can be used to link to this page
Your browser does not support the video tag.