Laserfiche WebLink
August 28, 2012 C- 1982- 057 /Seneca II -W Mine SLB <br />PW <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Pond 017 <br />Page 6 of 9 <br />Upper YPM -IA <br />Surge structure replacing Stock Tank T25 <br />Culvert through PM -2 and topsoil laydown area <br />YPM -IA and -1B in Pond 017 watershed <br />YPM -2A in Pond 016 watershed <br />