My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-30_INSPECTION - M1986159
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1986159
>
2012-08-30_INSPECTION - M1986159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:13 PM
Creation date
8/31/2012 1:50:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986159
IBM Index Class Name
INSPECTION
Doc Date
8/30/2012
Doc Name
Extend the Corrective Action Date.
From
Martin Marietta Materials
To
DRMS
Inspection Date
4/10/2012
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Martin Marietta Materials <br />. A ...AC q7 , A4..W. MOW' •;•ibi+cYE '.. -f:.:' �.;x'iR9GM1� - ANIOalcao.4 <br />Merri .[k'AP1 ,4 • • •z me e.Asa:l8"r:: rST".fl': ;4,m, <br />Rocky Mountain Division <br />10170 Church Ranch Way, Suite 201 <br />Westminster, CO 80021 <br />August 24, 2012 <br />/Mr. Timothy Cazier <br />Division of Reclamation Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80504 <br />Re: Follow up to inspection for M- 1986 -159 <br />Dear Mr. Cazier: <br />Please accept this letter as our request to extend the corrective action date from 8/27/12 to <br />1/31/12 for the following problems: <br />1) The operator shall repair erosion gullies and ruts in phase III area and measures will be <br />taken to control the erosion in the drainages adjacent to the haul roads. <br />We have come up with a plan to control the haul road drainage issue but since this will be third <br />time we have repaired it, we have contracted with a consultant to verify that our design can <br />handle the flow. It does not rain often at this location but when it does it is a lot. The design <br />should be done by the end of September. <br />We would like to utilize our own staff through the winter months to construct and repair instead <br />of doing winter layoffs in November. Until November, we will not have the manpower or <br />equipment to do the work internally and would have to contract it all out. <br />Sincerely, <br />IQ`71,e,e416(ces <br />J( lie Mikulas <br />Land Manager <br />RECEIVED <br />AUG 3 <br />Aivision of Reclamation, <br />Meung & Safety <br />1 P. ,61 r /d4 Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.