Laserfiche WebLink
INSPECTOR'S NAME: Dennis Jones <br />FACILITY CONFIGURATION: Stockpond <br />SITE NAME: T -1 <br />MINE NAME: Seneca II -W <br />MINE I.D. NO.: C -82 -057 <br />*Major adverse changes in <br />the Engineering Manager <br />conditions noted in these <br />etc.) in the space on the <br />Comments: <br />PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />DATE: /* 5' lL 1. <br />DATE LAST INSPECTION: <br />Circle or write in appropriate response <br />these items could cause instability and should be reported to <br />and Mine Superintendent for further evaluation. Adverse <br />items should normally be described (extent, location, volume, <br />back of this sheet. <br />DAM REMOVED SPRING 2012, ROCK IN CHANNEL NOW <br />-3v -(2 <br />LOCATION: SW' %SE'4, Sec 16, T5N, R88W <br />LOCATION: 8 mi S of Hayden, CO <br />OWNER'S REP.: Dennis Jones <br />1. Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: Yes No N/A <br />At natural hillside: Yes No N/A <br />Over widespread areas: Yes No N/A <br />From downstream foundation area: Yes No N/A <br />"Boils" beneath stream or ponded water: Yes No N/A <br />3. Cracks or scarps on crest: Yes No N/A <br />4. Cracks or scarps on slope: Yes No N/A <br />5. Sloughing or bulging on slope: Yes No N/A <br />6. *Major erosion problems: Yes No N/A <br />7. Surface movements in valley bottom or on hillside: Yes No N/A <br />8. *Erosion of toe: Yes No N/A <br />9. *Water impounded against downstream toe: Yes No N/A <br />10. Existing embankment freeboard: feet <br />11. Increase Decrease in water level: feet <br />12. Cracks, bulging, or erosion on upstream face: Yes No N/A <br />13. Spillway erosion: Yes No N/A <br />14. *Clogging <br />Spillway channels: Yes No N/A <br />Diversion ditches: Yes No N/A <br />