My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-28_REVISION - M1982131
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982131
>
2012-08-28_REVISION - M1982131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:37 PM
Creation date
8/30/2012 7:22:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982131
IBM Index Class Name
REVISION
Doc Date
8/28/2012
Doc Name
Adequacy Review
From
DRMS
To
Applegate Group, Inc.
Type & Sequence
TR1
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />August 28, 2012 <br />Mrs. Carrie Herbolsheimer <br />Applegate Group, Inc. <br />1490 W. 121 Avenue, Suite 100 <br />Denver, CO 80234 <br />Re: Bucklen Equipment Company Pit, File No. M- 1982 -131 <br />Technical Revision No. 1 Adequacy Review <br />Dear Mrs. Herbolsheimer, <br />Mined Land Reclamation <br />STATE OF COLORADO <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />—&— <br />SAFETY <br />John W Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />The Division of Reclamation, Mining and Safety (Division) has reviewed the content of the technical <br />revision (TR -01) for the Bucklen Equipment Company Pit, File No. M- 1982 -131 and submits the <br />following comments. The Division is required to make an approval or denial decision no later than <br />September 6, 2012 therefore; a response to the following adequacy review concerns should be <br />submitted to the Division as soon as possible. <br />1. On Page 3 of the technical revision submittal in the Mining Plan section, the Operator states the <br />lake will have a surface area of approximately 29 acres. The Reclamation Plan map included in <br />the technical revision indicates a reduced lake size with the removal of the southeast corner of <br />area being backfilled and deeded to the City of Greeley. Please revise the anticipated lake area <br />to account for the reclamation plan change. <br />2. As required by Rule 3.1.5(2), when backfilling is a part of the plan, the Operator shall replace <br />overburden and waste materials in the mined area and shall ensure adequate compaction for <br />stability and to prevent leaching of toxic or acid - forming materials. Please revise the updated <br />reclamation plan to address the requirements of this rule by describing the backfilling operation <br />for the slopes. <br />3. Rule 6.2.1(2) requires maps be signed by a registered land surveyor, professional engineer, or <br />other qualified person. The Exhibit F map submitted to the Division was not signed. Please <br />resubmit a signed copy of the map. <br />6.4.19 EXHIBIT S - Permanent Man - made Structures <br />Where the mining operation will adversely affect the stability of any significant, valuable and <br />permanent man -made structure located within two hundred (200) feet of the affected land, the <br />applicant may either: <br />Office of Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.