Laserfiche WebLink
• The East Portal pad was constructed without disturbing the existing stream channel since the pad <br />embankment slopes adjacent to the stream channel were constructed at 1.5h:1v. During the <br />geotechnical investigation for this area or during construction, had it been determined that a 1.5h:1v <br />slope would not be stable, a bin type retaining wall would have been installed to ensure the stability <br />of the pad embankment. <br />\J <br />• F6) nni t Rt6v -.. 4 � P iiOSV2j A!36 <br />