Laserfiche WebLink
LIST OF FIGURES <br />Fieure No. <br />13-1 Reclamation Timetable <br />13-2 Typical Section of Temporary Pit Reclamation <br />13-3 Typical Plan View of Temporary Pit Reclamation <br />LIST OF ATTACI IMENTS <br />Attachment No. <br />13-1 Bond Calculation woxksheets <br />LIST OF APPENDICES <br />Appendix No. <br />13-1 1980 Revegetation Success Evaluation Report <br />13-2 Pertnit Stipulation Responses <br />13-3 1985 Revegetation Monitoring Report <br />13-4 Alfalfa Management and Control Plan <br />13-5 Noxious Weed Control Plan <br />13-6 Revegetation Plan -Pond 008/East Wadge Extension Area <br />13-7 Revegetation Plan -North Wadge Deadhead Route <br />13-8 Rock Checkdam Design <br />13-9 Stock Tank Design <br />13-9A Stock Pond Stability Analysis <br />13-10 Shrub Establishment Studies <br />Pa4ee <br />13-29 <br />13-35 <br />13-36 <br />13-11 CSU/DMG Permanent Shrub Plots <br />13-12 Postmine Permanent Features <br />13-12a Landowner Requests fox Permanent Features <br />13-13 Vegetation Evaluation Procedures for Testing Reclamation Adequacy for Phase III Bond Release <br />13-14 Weed Management Plan <br />13-15 Historical Approaches to Testing for Successful Reclatation <br />73-16 Wolf Creek Pre-Law Area Remediation Plan <br />MR-57 13-iii Revised 09/07 <br />