Laserfiche WebLink
TABLE V-2 <br /> DESERADO MINE WATER IMPOUNDMENT STRUCTURES <br /> POND SIZE LOCATION DETAIL <br /> LOCATION I.D. NO. (ac-ft) TYPE PURPOSE DRAWING DRAWING <br /> DP-1* 7.0 Embankment Sediment Map 15 Map 34 <br /> Emergency <br /> PP-1 0.23 In situ Map 15 Map 142 <br /> "D" Portal dump <br /> PP-2 5.5 Semi-in situ Process water Map 15 Map 142 <br /> settling <br /> RP-1 3.1 Semi-in situ Sediment Map 77 Map 78 <br /> RP-2/3 9.07 Semi-in situ Sediment Map 77A Map 80 <br /> Refuse Disposal Map 150 <br /> Area RP-4 12.91 Semi-in situ Sediment Map 77A Map 80 <br /> Map 150 <br /> RP-5 11.0 Semi-in situ Sediment Map 77A Map 80A <br /> Loadout RR-1 0.77 Semi-in situ Sediment Map 103A III 40 <br /> Loadout sump RRS-1 0.011 Semi-in situ Sediment Map 103A <br /> Slot Storage SS-1 1.4 Semi-in situ Sediment Map 112 <br /> SS-2 0.45 Semi-in situ Sediment Map 112 <br /> Halandras HSL-1 0.016 Semi-in situ Sediment Map 136 <br /> Landfill <br /> SDH-2U Semi-in situ Sediment Map 147 <br /> Down hole sump SDH-2L Semi-in situ Sediment Map 147 <br /> pond SDH-3 0.11 Semi-in situ Sediment Map 147 Map 140 <br /> Map 143 <br /> BSDP-1 0.17 Semi-in situ Sediment Map 157 Map 157 <br /> B-Seam BSDP-2 0.20 Semi-in situ Sediment Map 157 Map 157 <br /> Dewatering BSDP-3 0.10 Semi-in situ Sediment Map 157 Map 157 <br /> System BSDP-4 0.20 Semi-in situ Sediment Map 157 Map 157 <br /> Last 0.24 Semi-in situ Sediment Map 157 Map 157 <br /> Chance <br /> East Portal EP-x NA Reclaimed Sediment Map 139 <br /> TS-1 0.011 Semi-in situ Sediment Map 109 <br /> Transfer buildings TS-2 0.007 Semi-in situ Sediment Map 111 <br /> TS-2A 0.14 Semi-in situ Sediment Map 147 Map 149 <br /> Raw Water AL-1 13 Semi-in situ Water Map 90 Map 91 <br /> Lagoon Storage <br /> * Impoundment structure has a portion of its embankment in excess of 10 feet in height and has been <br /> approved by the Office of the State Engineer,Colorado. <br /> drainage characteristics, it is anticipated that a substantial amount of water will percolate through <br /> the pond sides and bottom and enter the groundwater system. The suspended solids will be <br /> Minor Revision#152 (05/2012) V-6 <br />