Laserfiche WebLink
Table G <br /> TEMPORARY SLUDGE DISPOSAL POND/BORROW AREA ADJACENT TO ANIMAS RIVER <br /> Task Parameters When Done Comments <br /> Sample Monitoring Wells Refer to Table I Aprfor Years../Oct. 1 <br /> (Attached) for <br /> Parameters. <br /> Placement of Riprap Armor Embankment (2) <br /> 2 <br /> Impoundment, (3) (3) <br /> Cover Im <br /> Reclaim Sites p <br /> With Two Feet of <br /> Borrow; Grade to Low <br /> Dome of About 2%, <br /> Seed, Fertilize, <br /> Mulch; Grade Borrow, <br /> Revegetate. <br /> Seeding Stabilize Soil/ g During Operations (4) <br /> Peat Stockpile Located <br /> near Borrow Area Above <br /> Temporary Disposal Area. <br /> (1) The revised and approved application indicates a frequency of <br /> twice per year (Apr. and Oct.) for three years. Data to be <br /> submitted to the MLRD with the company's annual report. <br /> (2) Rip rap has been placed on the southern one-third (the section <br /> nearest the river) of the flood control dike. In addition, the <br /> plan indicates the outslopes of the temporary sludge disposal pond <br /> will be armoured on an as needed basis. <br /> (3) According to an agreement in the plan, to be reclaimed by July 31, <br /> 1988; or sooner, contingent upon the removal of the Engineering <br /> Building from the site by the County. <br /> (4) The intent is to stabilize and protect the material for use in final <br /> reclamation. <br /> -7- <br />