My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-28_INSPECTION - C2009087 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2009087
>
2012-08-28_INSPECTION - C2009087 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:02 PM
Creation date
8/29/2012 7:38:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Inspection
Doc Date
8/28/2012
Doc Name
Inspection Report
From
DRMS
To
Scott Cowman
Inspection Date
8/22/2012
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 22, 2012 C -2009- 087 /Peabody Sage Creek Mine JDM <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />All roads from the North facilities Area to the topsoil pile at the South Facilities Area were identified and appeared <br />stable at the inspection. Road culverts SC 19 and 15A were observed in the photos with no problems noted. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The majority of the mine site was previously approved under the Seneca II Mine (C- 1980 -005). These areas, with <br />the exception of the currently approved disturbance boundary have been Phase II released and the remaining areas <br />are currently a part of SL -1 which is a Phase 11 bond release application currently being reviewed by the Division. <br />The reclaimed areas are stable with good vegetation growth and no problems noted. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.063; Redistribution 4.06.4: <br />Topsoil salvaging and storage was recently active in areas of drainage modification. Fresh topsoil has been <br />salvaged and is being placed at the toe of the approved topsoil pile. Vegetation on the topsoil pile is minimal. A <br />full growing season has yet to be achieved on the pile. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.