Laserfiche WebLink
C. <br />LOCATION MAP: Attach a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). <br />3 (Form 2- Public) <br />D. Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? Yes No V <br />E. Specify the Land Management Agency, Address and Telephone Number: <br />5^ —f e K . tig- rtc -f <br />()719) g c j <br />F. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NO[ was sent to the BLM or <br />USFS. Check one: <br />once of notification is attached to this NOI for BLM Land <br />vidence of notification is attached to this NOI for USFS Land. <br />Other proof of notice is attached to this NOI <br />II. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />1. identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected. This includes the location of all drill holes, mud pits, excavations, trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION <br />1. Mineral(s) and/or Resource(s) being Investigated: <br />2. Estimated dates of commencement and completion: <br />Commencement: ,A14 4tgS+' /� �� Axes- <br />4-0 <br />Completion: �_l a [/W- ✓/ V'� / !� G�.-�r <br />3. Amount of material to be extracted, moved or ro osed to be moved: � <br />A P _y,.�r� 7d �p,,00c>. 69Ud1��P <br />4. Identify the type or method of prospecting proposed and quantity (place an "X ") ✓ <br />Cuts Pits Trenches <br />Shafts Tunnels Adits Declines <br />Air Drilling Fluid Drilling Drilling & Blasting <br />