Laserfiche WebLink
w 11 <br />LMI= <br />ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />AUG 5 <br />AUG 6 <br />AUG 7 <br />AUG 8 <br />AUG 9 <br />AUG 10 <br />AUG 11 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Bill Erickson <br />- <br />LS <br />LS <br />LS <br />- <br />LS <br />- <br />Ben Melly <br />- <br />- <br />LG <br />LG <br />LG <br />LG <br />LG <br />Steve Rice <br />- <br />ST <br />ST <br />ST <br />ST <br />- <br />- <br />Alyssa Wagner <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Uwe Kelley <br />- <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />Austin Hall* <br />- <br />LT <br />LT <br />LT <br />LT <br />- <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />SE = Senior Engineer <br />MEW Weekly Report WE 08.11.2012 <br />