Laserfiche WebLink
TLI M-JLe <br />FIN 9f- ITN:IJil:Ik111_1 <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />JUL 1 <br />JUL 2 <br />JUL 3 <br />JUL 4 <br />JUL 5 <br />JUL 6 <br />JUL 7 <br />Joseph Hickey <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Bill Erickson <br />- <br />LS <br />- <br />- <br />- <br />LS <br />LS <br />Ben Melly <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Steve Rice <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Alyssa Wagner <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Uwe Kelley <br />- <br />ST <br />- <br />- <br />- <br />ST <br />ST <br />Austin Hall* <br />- <br />LT <br />- <br />- <br />- <br />LT <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Ron Arlian <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />IFGFNn <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />SE = Senior Engineer <br />MEW Weekly Report WE 07.07.2012 <br />