T Lm <br />11M <br />necessary) and compacted using a 10 -ton vibratory smooth drum compactor, passing over the <br />entire fill surface at least 4 times (method compaction technique was applicable). <br />C) Slope Contouring <br />Slope contouring was performed using various CAT dozers and a John Deere 850 excavator. <br />Material generated during slope contouring was placed as overburden fill at the top of the slope. <br />D) Soil Liner Fill (SLF) <br />Processing of Soil Liner Fill material continued at the East Cresson Clay Processing area. A CAT <br />D -8 dozer, a Hitachi 200 excavator, and a CAT 980 front -end loader were used to process the <br />material. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />E.Cresson Clay Process <br />4,866 <br />34,277 <br />DCF processing is temporarily paused <br />Total <br />4,866 <br />34,277 <br />DCF processing is temporarily paused <br />E) Drain Cover Fill (DCF) <br />No work performed during the week. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />DCF Process <br />- <br />158,613 <br />DCF processing is temporarily paused <br />Total <br />- <br />158,613 <br />DCF processing is temporarily paused <br />F) Miscellaneous <br />No work performed during the week. <br />II) Underground Mine Workings <br />A) Discovery <br />During fill operation an Underground Working was encountered. The location was surveyed by <br />Ames and given a project designation of UG#4091 (Shown on Figure 2). <br />B) Drilling <br />No work performed during the week. <br />C) Remediation <br />Underground Working #4091 was investigated using a CAT 330 excavator and observation was <br />performed by an AMEC field representative. Excavation of the area was performed and it was <br />found to be a shallow surface working. The native material was found to be consistent and all <br />signs of a significant working were removed. The working was backfilled with structural fill in 18" <br />to 24" lifts using various CAT dozers. Each lift was moisture conditioned using a tandem axle <br />water truck (when necessary) and compacted using a 10 -ton vibratory smooth drum compactor, <br />passing over the entire fill surface at least 4 times (method compaction technique was applicable). <br />III) Geosynthetics <br />A) Geomembrane Delivery <br />No work performed during the week. <br />MEW Weekly Report WE 07.07.2012 <br />