amet_- <br />encountering seventeen voids. An approximate total of 1,250 linear feet was drilled. As -built <br />survey of the drill holes was performed by Ames. <br />Grouting of missed (non -void) confirmatory drill holes was performed at Underground Workings <br />#4073 and #4081. A grout pump and laborers were used to place bentonite grout into the "miss" <br />drill holes. <br />C) Remediation <br />Remediation of Underground Working #4045 was performed placing the concrete plug in the <br />working. Seven feet of cemented rock fill was placed on top of the previously placed concrete. An <br />AMEC field representative observed cemented rock fill. <br />Remediation of Underground Workings #4052 and #4058 was performed excavating the crown <br />pillar from the working. A portion of the crown pillar was removed during the excavation. The <br />remaining crown pillar will be drilled and collapsed by blasting. <br />Remediation of Underground Working #4077 (The Wedge) was performed using a John Deere <br />excavator to remove timbers and unsuitable material from the working. Coarse shaft backfill <br />placement was then performed filling the open shaft. The working was backfilled to approximately <br />10 feet from the existing ground surface. The sides were then shaped with 05V:1 H slopes <br />preparing the shaft for concrete plug installation. An AMEC field representative observed the <br />backfill and inspected the shaped upper portion of the shaft. It was found to be acceptable for <br />concrete placement. Approximately twenty cubic yards of approved concrete from Transit Mix was <br />placed in the plug. The concrete placement was observed and tested by an AMEC field <br />representative. Slump, air entrainment, and temperature testing was performed with results <br />passing. One set of nine 4 "x 8" cylinders were cast for laboratory compressive strength testing. <br />The crown pillar at Underground Working # 4081 was collapsed by blasting. A CAT 330 excavator <br />was used to excavated the collapsed crown pillar from the working. An AMEC field representative <br />observed the remediation activities. <br />D) Structures <br />No work performed during the week. <br />III) Geosynthetics <br />A) Geomembrane Installation <br />No work performed during the week. <br />B) Anchor Trench <br />No work performed during the week. <br />C) Geomembrane Exposure <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />No work performed during the week. <br />1V)Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />MEW Weekly Report WE 05.19.2012 <br />