My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244 (14)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 2:50:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT, APRIL 2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />D) Overburden Fill Placement <br />Overburden fill material was delivered from CC &V Mine Operations throughout both day and night <br />shifts. An Ames CAT D -10 dozer was used to maintain the borrow area. A CAT 993 front -end <br />loader and a CAT 992 front -end loader were used to load overburden fill material into CAT 40 -ton <br />articulating, CAT 773, and CAT 777 haul trucks. <br />Overburden fill was placed in the areas shown on Figure 1. Overburden fill was placed in 36" to <br />40" loose lifts using various CAT dozers, keying into existing slopes when necessary. Various <br />CAT excavators with a hammer attachments "broke up" oversize boulders before they were <br />placed in the fill. Each lift was moisture conditioned using a CAT 773 water truck (when <br />necessary) and compacted using a 10 -ton vibratory smooth drum compactor, passing over the <br />entire fill surface at least 4 times (method compaction technique was applicable). <br />Subgrade temperatures were monitored by an AMEC field representative prior to fill placement. <br />Fill material was not placed until the entire fill area was at or above 32 °F. Fill temperatures were <br />then monitored every hour during ambient temperatures below 32 °F. No frozen material was <br />placed during the week. <br />E) Slope Contouring <br />Slope contouring was performed using a CAT 330 excavator, a John Deere 850 excavator, a CAT <br />D -6 dozer, a CAT D -8 dozer, and a CAT D -10 dozer. Material generated during slope contouring <br />was placed as overburden fill at the top of the slope. <br />F) Soil Liner Fill (SLF) <br />No work performed during the week. <br />G) Drain Cover Fill (DCF) <br />No work performed during the week. <br />Location <br />This Week <br />Cumulative <br />Comments <br />DCF Process <br />- <br />158,613 <br />DCF processing is temporarily paused <br />Total <br />- <br />158,613 <br />DCF processing is temporarily paused <br />H) Miscellaneous <br />No work performed during the week. <br />II) Underground Mine Workings <br />A) Discovery <br />No new Underground Workings were encountered during the week. <br />B) Drilling <br />Confirmatory drilling was performed at Underground Working #4074 using two track mounted drill <br />rigs. A drill pattern was set out by an AMEC field representative. Thirty -one holes were drilled <br />encountering six voids. An approximate total of 1550 linear feet was drilled. As -built survey of the <br />drill holes was performed by Ames. <br />MEW Weekly Report WE 04.14.2012 <br />