LTM <br />AMEC observed remediation of UG#4025. <br />AMEC observed remediation of UG#4026. <br />AMEC observed confirmatory drilling at UG #4031. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4031. <br />AMEC observed remediation of UG#4031. <br />AMEC observed remediation of UG#4044. <br />AMEC observed confirmatory drilling at UG #4047. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4051. <br />AMEC observed confirmatory drilling at UG #4052. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4053. <br />AMEC observed confirmatory drilling at UG #4058. <br />AMEC inspected UG#4071 encountered during cut. <br />AMEC inspected UG#4072 encountered during cut. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade preparation for fill placement for the Mill Site Earthworks project. <br />Continue slope contouring for the Mill Site Earthworks project. <br />Continue overburden fill placement for the Mill Site Earthworks project. <br />Continue confirmatory drilling of Underground Workings for the Mill Site Earthworks project. <br />Continue grouting "miss" (non -void) holes from confirmatory drilling. <br />Continue investigation and remediation of Underground Workings for the Mill Site Earthworks project. <br />Continue structure removal /relocation for the Mill Site Earthworks project. <br />Continue construction of the catch berm and storm water channel for the Mill Site Earthworks project. <br />Summary of Non - conformances: <br />None Issued <br />MEW Weekly Report WE 03.24.2012 <br />