"AVA <br />WI Ime <br />loader and a CAT 992 front -end loader was used to load overburden fill material Into CAT 40 -ton <br />articulating and CAT 777 haul trucks. <br />Overburden fill was placed in the areas shown on Figure 1. Various CAT excavators with a <br />hammer attachments "broke up" oversize boulders before they were placed in the fill. Overburden <br />fill was placed in 18" to 24" lifts using various CAT dozers, keying into existing slopes when <br />necessary. Each lift was moisture conditioned using a CAT 773 water truck (when necessary) and <br />compacted using a 10 -ton vibratory smooth drum compactor, passing over the entire fill surface at <br />least 4 times (method compaction technique was applicable). <br />Subgrade temperatures were monitored by an AMEC field representative prior to fill placement. <br />Fill material was not placed until the entire fill area was at or above 32 °F. Fill temperatures were <br />then monitored every hour during ambient temperatures below 32 °F. No frozen material was <br />placed during the week. <br />E) Slope Contouring <br />Slope contouring was performed using a CAT 330 excavator, a CAT 345 excavator, a Hitachi 350 <br />excavator, and a CAT D -6 dozer. Material generated during slope contouring was placed as <br />overburden fill at the top of the slope. <br />F) Soil Liner Fill (SLF) <br />No work performed during the week. <br />G) Drain Cover Fill (DCF) <br />No work performed during the week. <br />Location <br />This Week <br />Cumulative <br />Comments <br />DCF Process <br />- <br />158,613 <br />DCF processing is temporarily paused <br />Total <br />- <br />158,613 <br />DCF processing is temporarily paused <br />H) Underdrain <br />Underdrain construction is complete for the Mill Site Earthworks project. <br />I) Miscellaneous <br />A CAT D -8 dozer and a Hitachi 350 excavator were used to construct access and pole locations <br />preparing relocate the power line within the Mill Site footprint. <br />II) Underground Mine Workings <br />A) Discovery <br />During cut to fill two Underground Workings were encountered. The locations were surveyed by <br />Ames and given a project designations of UG#4071 and UG#4072. <br />B) Drilling <br />Confirmatory drilling was performed at Underground Working #4007. A drill pattern was set out by <br />an AMEC field representative. Fourteen holes were drilled encountering no voids. An approximate <br />total of 700 lineal feet was drilled. As -built survey of the drill holes was performed by Ames. <br />MEW Weekly Report WE 03.24.2012 <br />