Laserfiche WebLink
An <br />im <br />ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />FEB 12 <br />FEB 13 <br />FEB 14 <br />FEB 15 <br />FEB 16 <br />FEB 17 <br />FEB 18 <br />Joseph Hickey <br />- <br />PR <br />PR <br />- <br />PR <br />PR <br />- <br />Bill Erickson <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />Ben Melly* <br />- <br />LG <br />LG <br />- <br />LG <br />LG <br />- <br />Steve Rice <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Uwe Kelley <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Kim Morrison <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />SE = Senior Engineer <br />MEW Weekly Report WE 02.18.2012 <br />